PROJECT INFORMATION
Project: Construction of The Lost Shtetl Museum
Area: 3000 sq km
General Contractor: UAB “Agentus”
Place: Šeduva, Lithuania
Start of the project: on May 2018
End of the project: in the middle of 2020
PROJECT DESCRIPTION
After several stages of general contractor selection for the construction of the Lost Shtetl Museum Agentus was confirmed as the general contractor.
The Lost Shtetl Museum is scheduled to open its doors to the public in the summer of 2020.
It will have a total floor space of about 3,000 square meters. The Holocaust Memorial Information Center in Berlin has already listed the Lost Shtetl Museum on its list of European memorial sites.